The Grand TODO

Everything that needs doing as of 10/18/2024.

Interior

  • Clean the interior of of mold [9/24/24 - Mold]
  • Remove the old head and 6.5 gal holding tank
  • Replace bedding
  • Add dorade vents + cowls [10/7/24 - Ventilation]
  • Install a (larger) holding tank and redo head with an electric toilet
  • Diagnose refrigerator issues [10/4/24 - Refrigerator troubleshooting]
  • Redo interior lighting, removing some of the old fluorescents
  • Rerun most of the interior wiring
  • Modify old brass kerosene lamps to become electric
  • Re-paint some of the interior
  • Repaint floor or add vinyl flooring
  • Install drop-down trashcan

Exterior

  • Clean the mainsail
  • Install roller furling on jib
  • Replace rigging lines
  • Bottom cleaning + a fresh coat of bottom paint
  • Clean and polish old exterior teak + deck
  • Fix and fill in some small cracks on the fiberglass
  • Add ship's name to bow